The following specification documents are provided to assist connection companies in the execution of new connections:
| Document Number |
Issue |
Document Name |
Date Uploaded |
| ASSET-01-015 |
Issue 1 |
New Connections Contractor Approval Policy |
02/08/2005 |
| ASSET-01-016 |
Draft |
Requirements for New Connection Contractors to construct networks to be considered for Adoption |
09/09/2005 |
| ASSET-04-015 |
Issue 1 |
Operating Regime for Contestable Network Construction on Greenfield Housing Sites |
02/08/2005 |
| ASSET-04-015 |
Issue 1, Appendix 1 |
Declaration of Test Results for LV New Cable Installations |
02/08/2005 |
| ASSET-04-015 |
Issue 1, Appendix 2 |
Completion Certificate For New Cable Installations |
02/08/2005 |
| ASSET-04-015 |
Issue 1, Appendix 3 |
Entering / Exiting the Live Working Regime |
02/08/2005 |
| ASSET-04-020 |
Issue 3 |
Auditing and Escalation Regime |
21/09/2009 |
| ASSET-04-025 |
Issue 2 |
Project Completion Process for Contestable Works |
15/11/2005 |
| ASSET-04-030 |
Issue 2 |
CRAM Process for Contestable Connection Projects |
03/09/2008 |
| ASSET-04-030 |
Issue 2, Appendix 2 |
Project Notification Form |
03/09/2008 |
| ASSET-04-030 |
Issue 2, Appendix 4 |
Design Approval Documentation Form |
03/09/2008 |
| ASSET-04-030 |
Issue 2, Appendix 7 |
Third Party Connection Request Form |
03/09/2008 |
| BATT-06-001 |
Issue 2 |
Approved Equipment Register - Batteries |
21/09/2009 |
| BUPR-22-015 |
Issue 1 |
Recording of Electrical Assets by Contractors |
02/08/2005 |
| CAB-03-032 |
Issue 1 |
Specification for the Installation of Low Voltage Internal mains and Services |
23/04/2009 |
| CAB-04-008 |
Issue 1 |
Assessment of Third Party LV Cable Jointing Systems |
02/08/2005 |
| CAB-04-009 |
Issue 2 |
Policy & Application Guide for 11kV Polymeric Cables |
02/08/2005 |
| CAB-06-001 |
Issue 5 |
Approved Equipment Register - Cables & Cable Accessories |
14/05/2008 |
| CAB-15-003 |
Issue 7 |
Handling & Installation of Cables up to and Including 33kV |
17/08/2010 |
| DOC-00-217 |
Issue 5 |
Distribution Low Voltage Earthing Manual Documents Index |
08/09/2010 |
| DOC-00-280 |
Issue 25 |
Approved Equipment Register |
08/09/2010 |
| EART-01-002 |
Issue 3 |
Low Voltage Earthing Policy |
12/06/2009 |
| - |
- |
Distribution Low Voltage Earthing Manual (To be read alongside EART-01-002) |
02/08/2005 |
| EART-02-003 |
Issue B |
Earthing and Bonding at Secondary Substations |
02/08/2005 |
| EART-06-001 |
Issue 1 |
Approved Equipment Register - Earthing |
02/08/2005 |
| EPS-01-004 |
Issue 5 |
Policy for Signing and Guarding of Electrical Network Apparatus |
24/04/2007 |
| EPS-01-007 |
Issue 1 |
Standard Low Voltage Connection Arrangements |
27/11/2008 |
| EPS-02-005 |
Issue 1 |
Installation & Record Framework for Greenfield Low Voltage Housing Estate Underground Networks and Associated, New, HV/LV Distribution Substations |
02/08/2005 |
| EPS-02-006 |
Issue 1 |
Installation and Record Framework for Industrial and Commercial Underground Connected Loads Up To and Including 11kV |
02/08/2005 |
| EPS-03-027 |
Issue 1 |
Materials Specification Framework for Greenfield Low Voltage Housing Estate Underground Network Installations and Associated, new, HV/LV Distribution Substations |
02/08/2005 |
| EPS-03-031 |
Issue 1 |
Materials Specification Framework for Industrial and Commercial Underground Connected Loads Up To and Including 11kV |
02/08/2005 |
| EPS-06-001 |
Issue 2 |
Approved Equipment Register - Surge Arresters |
19/04/2007 |
| EPS-06-002 |
Draft |
Approved Equipment Register - Ancillary Meter Termination Equipment |
09/09/2005 |
| ESDD-02-012 |
Issue 2 |
Framework for design and planning for low voltage housing developments underground network installations and associated, new, HV/LV distribution substations |
02/08/2005 |
| OHL-01-007 |
Issue 2 |
Overhead Lines in the Vicinity of Recreational
Areas |
02/09/2010 |
| OHL-02-015 |
Issue 2 |
Code of Practice for the Provision of LV Supplies to Equipment Associated with Transmission Towers |
21/02/2009 |
| OHL-03-099 |
Issue 1 |
Specification for 11kV And 33kV Overhead Lines of Unearthed Construction on Single and "H" Type Wood Poles |
03/07/2007 |
| OPSAF-13-001 |
Issue 6 |
(PSMSP 5.1) Authorisation Procedures |
02/08/2005 |
| SUB-02-006 |
Issue 5 |
Secondary Substation Installation & Commissioning Specification |
01/02/2007 |
| SUB-02-013 |
Issue 3 |
Policy and Specification for the Interface with Independent Distribution Network Operators Installation |
18/10/2007 |
| SUB-02-613 |
Issue 1 |
Electrical Insulation Testing of HV Equipment up to 33kV |
02/08/2005 |
| SUB-02-613 |
Issue 1, Appendix 2 |
Electrical Insulation Testing of HV Equipment up to 33kV |
02/08/2005 |
| SUB-03-017 |
Issue 3 |
General Specification For The Civil Engineering And Building Design And Construction Of Secondary Substations |
01/09/2009 |
| SWG-06-001 |
Issue 3 |
Approved Equipment Register - Switchgear |
02/08/2005 |
| TRAN-06-001 |
Issue 4 |
Approved Equipment Register- Transformers & Bushings |
13/05/2009 |
| TSE-06-001 |
Issue 13 |
Approved Equipment Register - Tools and Special Equipment |
27/04/2010 |