Calculate an Indicative Cost
An example of indicative connection costs for larger connection schemes requiring the establishment of a dedicated to a Primary or Grid Supply Point substation can be identified by selecting the following appropriate high level criteria:
Some smaller developments (above the 16A per phase threshold) may only require works to connect to the network in the immediate vicinity of the generator development. Indicative costs for these works may be found in the Charging Methodology, for which a link is provided below. A link to the associated terms and conditions is also provided:
"Whilst all reasonable care has been taken in the preparation of the information and data presented within these pages, SP Distribution Ltd and SP Manweb plc are not responsible for any loss that may be attributed to the use of the data."