Application Forms and GuidesApplication Forms and GuidesGuidesDNO Queue Entry Requirements for Generation SchemesENA Distributed Generation Connection Guide : G98 and G99Guide for G100 Export Limitation SchemesFormsEREC G98 formsForm A: Application for connection of multiple Micro-Generating installationsForm B: Installation Document for connection under G98Form C: Type Test Verification ReportForm D: Micro-generator Decommissioning ConfirmationEREC G99 formsForm A1-1: Application for connection of Power Generating Module(s) with Total Aggregate Capacity <50 kW 3-phase or 17 kW single phaseForm A1-2: Application for connection of Fully Type Tested Generation under the Small Generation Installation ProceduresForm A1-3: Application for connection of Power Generating Module(s) with Total Aggregate Capacity <50 kW 3-phase or 17 kW single phase where the output is shared with two or more CustomersForm A2-1: Compliance Verification Report for Synchronous and Asynchronous (non inverter) Power Generating Modules up to and including 50 kWForm A2-2: Compliance Verification Report for Synchronous and Asynchronous (non inverter) Power Generating Modules > 50 kWForm A2-3: Compliance Verification Report for Type A Inverter Connected Power Generating Modules Form A2-4: Site Compliance and Commissioning test requirements for Type A Power Generating ModulesForm A3-1: Installation Document for Type A Power Generating Modules Form A3-2: Installation Notification Form for Small Generation Installation Procedures 2 and 3.Form A3-3: Installation Notification Form for Small Generation Installation Procedure 1Form A3-4: Installation Document for Type A Power Generating Modules where the output is shared between two or more CustomersForm B2-1: Power Generating Module Document for Type B Power Generating ModulesForm B2-2: Site Compliance and Commissioning test requirements for Type B Power Generating ModulesForm B3: Installation and Commissioning Confirmation Form for Type B PGMsForm C2-1: Power Generating Module Document for Type C and Type D Power Generating ModulesForm C2-2: Site Compliance and Commissioning test requirements for Type C and Type D Power Generating ModulesForm C3: Installation and Commissioning Confirmation Form for Type C and Type D PGMsForm D1: Power Generating Module Decommissioning ConfirmationG99 - zip file of separate forms from SAF, in case the Generator needs to complete multiple sheets for their applicationEREC G99 Standard Application FormOther LinksPolicy & Guidance on Extension to Validity Periods of Connection or POC OffersStatement of Works ProcessWhilst all reasonable care has been taken in the preparation of the information and data presented within these pages, SP Distribution plc and SP Manweb plc are not responsible for any loss that may be attributed to the use of the data.