Project Documents

All of the following documents are available free for download.  If you would like a hard copy there may be a fee to cover printing and postage.  

Second round of consultation: ENDED

KTR Project leaflet
The project leaflet outlining the KTR Project project and the details of our second round of consultation

KTR Project:Routeing and Consultation Document (October 2016)
A document which outlines the methodology and findings of the routeing study which has been undertaken to inform consultation, as well as the details of the public consultation process.

List of designated information points

Information points are still available 

Electric and Magnetic Fields The Facts June 2013 (download from external website www.emfs.info)

This is a guide, produced by the UK electricity industry which summarises the background to the EMF issue, explains the research undertaken with regard to health and discusses the conclusion reached.

Dumfries & Galloway Developers Forum July 2016

Click here for information from the Dumfries & Galloway Developers Forum

Ofgem Submission July 2016

DGSR Conclusions Report Executive Summary

First round of consultation: June 9 to August 31 2015 (ENDED)

Summary of Feedback from 2015 Consultation, which remains relevant to a revised scheme, published July 2016

Appendices to Summary of Feedback from 2015 Consultation, published July 2016

Interim summary from first round, published February 2016

Appendices from first round of consultation published February 2016 

Documents referred to during the first round

DGSR Project leaflet: Powering Your Future
The project leaflet outlining the project and the details of our first round of consultation

Background to Need Case

The need for the Dumfries and Galloway Strategic Reinforcement project in more detail

Major Electrical Infrastructure Projects: Approach to Routeing and Environmental Impact Assessment
SP Energy Networks’ approach to routeing overhead lines and substations.

DGSR Project Routeing and Consultation Document (May 2015)
A document which outlines the methodology and findings of the routeing study which has been undertaken to inform consultation, as well as the details of the public consultation process.