Skip to main content
Sustainability | ScottishPower | Iberdrola.com

Select Language:

ConnectMore EV Connection Cost Estimator

ConnectMore EV Connection Cost Estimator relates to the electrical network within the SP Manweb plc licence area (Merseyside, Cheshire, North Shropshire and North & Mid Wales). ConnectMore EV Connection Cost Estimator will provide an indication of the costs associated with connecting Electric Vehicle (EV) chargepoints onto the high voltage (HV) and low voltage (LV) SP Energy Networks electrical network based on the network capacity (Electricity Network Capacity) and connection conditions.

SP Manweb plc and the SP Energy Networks group companies will not be liable for any loss, whether such loss is direct, indirect, special or consequential, suffered by any party as a result of their use of the SP Energy Networks website, its software or content.  Any downloading of material from the website is done at the user’s own risk and the user will be solely responsible for any damage to any computer system or loss of data that results from such activities.

Whilst all reasonable care has been taken in the preparation of information and data presented within these pages, SP Manweb plc and the SP Energy Networks group companies do not accept any responsibility for, or liability for, the accuracy or the completeness of the content, data or other information available through these pages and/or the application. SP Manweb plc and the SP Energy Networks group companies are not responsible or liable for any loss or damage that may arise from or be attributed to the use of, or reliance on such data, content or other information. 

SP Manweb plc and the SP Energy Networks group companies do not make any warranty, either express or implied, that the use of any content, data or other information available through these pages and/or the application will not infringe the rights of any third party.

The costs associated with connecting the EV chargepoint(s) are indicative only and are solely intended to be used as a basis for further discussions and may vary considerably from any further estimates or price in any formal offer that follows.

Please be aware that this estimate is based only on a preliminary assessment of the information supplied and does not include any detailed design work or site-specific considerations.

The use of ConnectMore EV Connection Cost Estimator does not initiate a connection request and does not offer or guarantee any right of connection.

By clicking ‘OK’, you acknowledge that you have read and understood the information provided above and accept the terms of the above disclaimer.

OK

 

Hi! I'm the SP Energy Networks System Agent, can I help you?