Clydesmill to Strathaven Upgrade Project (CVUP)

SP Energy Networks is upgrading the electricity network in central and southern Scotland. With total demand set to double by 2050, we need a grid that’s ready to meet future electricity needs, while boosting the nation’s energy security for generations to come. To learn more about how we are aiming to meet future energy needs, please read about our Strategic Network Design work

To help make this happen, we are proposing to upgrade the existing overhead electricity line between our Clydesmill (Cambuslang) and Strathaven (Hamilton) substations, enabling the eastern side of the line to operate at 400 kV while the western side continues to operate at 275 kV. The work will also include a new 275 kV underground cable, a new tower at both substations, an extension to our existing Strathaven substation, and improvements to existing towers. This will help strengthen the electricity transmission network and help secure energy supplies for the future.

Our proposals

Our proposals

Our proposed upgrade works include: 

  • refurbishing and reconductoring works on a 10.4km stretch of existing overhead line between our Clydesmill and Strathaven substations
  • constructing new towers at Clydesmill and Strathaven substations
  • installing a new 275kV underground cable between Strathaven substation and our Malcolmwood compound
  • extension to existing Strathaven substation

Proposed Development 

CVUP Proposed

The reconductoring of the existing line and the improvements to the existing towers have previously been consented and no further consent for these works is being sought as part of the current application. These works will nevertheless be included within the Environmental Impact Assessment, that will accompany the application for consent, where appropriate. This will enable the environmental effects of the overall works to be assessed comprehensively. 

We aim to complete these works with as little disruption to local communities and the environment as possible. For this project, we propose using existing infrastructure where possible, reducing the need for new construction and supporting a more efficient use of resources. We are developing our proposals with these considerations in mind, alongside technical and economic feasibility.

Our first public consultation will run from Monday 2 November to Tuesday 1 December 2026. During this period, we will be seeking feedback from local communities, businesses and other stakeholders to help us further develop our proposals. Further information on our proposals can be found under the ‘Project Documents’ tab. Please visit the ‘Have your say’ tab for information on how to provide feedback.

Project Documents

Have your say

Have your say

Our first public consultation for the initial proposals will open from Monday 2 November to Tuesday 1 December 2026, during which you can provide feedback. If you have any queries before the consultation period, please reach out to us by phone, email or post using the contact details listed below.

We are holding two initial drop-in consultation sessions. There is no need to register. Simply come along and have a chat with us on the day:

  • Monday 2 November 2026, 3pm to 7pm
    Halfway Community Hub, 211 Hamilton Road, Cambuslang G72 7PJ
  • Tuesday 3 November 2026, 3pm to 7pm 
    Hillhouse and Earnock Community Centre, 121 Hillhouse Road, Hamilton ML3 9TX 

Alternatively, you can provide project feedback via email at CVUP@spencontact.co.uk by calling 0800 107 8231 (freephone) or write to us at FREEPOST SPEN CVUP.

You can also provide your feedback using our online feedback form below.
https://www.smartsurvey.co.uk/t/03SART

Please note that any data collected through your consultation feedback will only be used to help understand views regarding the Clydesmill to Strathaven Upgrade Project. The data will not be used for any other purposes. The data will be collated and analysed to help in the reporting of consultation feedback.   

SP Energy Networks is committed to respecting your privacy and will comply with all applicable data protection and privacy laws. We’re consulting you to get your views on the proposed Clydesmill to Strathaven Upgrade Project, so we may need to share your information with certain other bodies for the purposes of the consultation and for creating reports. These are: other Scottish Power Group companies, third party service providers, contractors or advisors who provide services to us; relevant planning authorities.  

For further information on our Privacy Policy, please visit https://www.spenergynetworks.co.uk/pages/privacy.aspx 

What happens next?

What happens next?

Following our initial public consultation, we will continue to develop our proposals, taking feedback from communities and stakeholders into consideration, alongside ongoing environmental assessment and engineering work. Once we have refined our proposals, we will hold a further public consultation to share our updated proposals and explain how your feedback has helped to shape their development.

We are seeking to submit an application under Section 37 of the Electricity Act 1989 and apply to the Scottish Ministers for deemed planning permission under Section 57(2) of the Town and Country Planning (Scotland) Act 1997 for consent to construct the project. This will be submitted along with an Environmental Impact Assessment (EIA) Report which will assess and report on the project’s potential environmental impacts.

The improvements to the existing towers have previously been consented and no further consent for these works is being sought as part of the current application. These works will nevertheless be included within the Environmental Impact Assessment, that will accompany the application for consent, where appropriate. This will enable the environmental effects of the overall works to be assessed comprehensively.

All comments made through this consultation are not formal representations to the consenting authority. You will have an opportunity to make formal representation once we submit a Section 37 consent application for all proposed works to the Scottish Government’s Energy Consents Unit (ECU).

FAQs

FAQs

Who are SP Energy Networks? 

SP Energy Networks is part of the ScottishPower Group. We are responsible for the transmission and distribution of electricity in central and southern Scotland through SP Transmission (SPT) and SP Distribution (SPD), the distribution network in North Wales, Merseyside, Cheshire, and North Shropshire through SP Manweb (SPM), and the distribution network in North West England through SP Electricity North West (SP ENW). Our role is to maintain, operate and invest in our networks to secure a safe, reliable and economic service for current and future consumers.

What statutory obligations does SP Energy Networks have? 

Our statutory obligations are set out in the Electricity Act 1989 and in our transmission licence. We must develop and maintain an efficient, coordinated and economical transmission system in accordance with security and quality of supply standards. We must offer to connect new power generators to the system and, make sure any work we do keeps disturbance to the natural and built environment and the people who live in it, work in it or enjoy it to a minimum. 

Who regulates SP Energy Networks? 

We are regulated by Ofgem (Office of the Gas and Electricity Markets), and independent national regulatory body. Further information about Ofgem is available by:

Why is the Clydesmill to Strathaven Upgrade Project (CVUP) needed?

With electricity demand across Scotland expected to double by 2050, SP Energy Networks is undertaking long term investment to support the country’s transition to clean energy and ensure a secure and reliable power supply for future generations.

Our proposed upgrade to the existing transmission network between our Clydesmill (Cambuslang) and Strathaven (Hamilton) substations will help strengthen the electricity transmission network and help secure energy supplies for the future.

These upgrades will enable more renewable energy to be transported efficiently from where it is generated to where it is needed, increasing capacity and reducing constraints.

What exactly are we proposing?

The Proposed Development comprises of the following components:

  • Uprate the existing Clydesmill to Strathaven 275 kV double circuit overhead line to facilitate 400 kV operation. The No. 2 (eastern) circuit would be operated at 400 kV, whilst the No. 1 (western) circuit would continue to operate at 275 kV, creating a split-voltage operational arrangement. This will include strengthening of existing towers and foundations, where required.
    Substations works
  • Reconfiguration works at Clydesmill and Strathaven substations, comprising the construction of a new terminal tower at Clydesmill and a new tower at Strathaven to facilitate a 400 kV connection into the substation.
  • An extension of the existing Strathaven 400kV substation compound is required to facilitate the addition of one new bay.
    Underground cable (UGC)
  • Installation of new 275 kV UGC between the existing Strathaven Substation and the existing Malcolmwood compound.

To enable these works to be carried out, the Proposed Development may include installing temporary construction compounds, laydown areas, hardstanding, access roads and vegetation clearance for the construction phase.

    How much will the project cost? 

    The project is still in the early stages of development, so we are not yet able to provide a final cost. A full estimate will be prepared once the proposal has been fully defined.

    Who will pay for this project? 

    Ultimately, the cost of our investment in the electricity system is partly borne by consumers through electricity bills, so we are obliged to be economic and efficient. We recover our costs through transmission charges levied by National Grid.

    The amount we invest in our networks and the amount we are able to recover is agreed with Ofgem, which is committed to working with industry, governments and consumer groups to deliver a net zero economy at the lowest cost to consumers. You can find out more about  About us | Ofgem

    How are you consulting local people?

    We plan to undertake two rounds of public consultation and a final presentation event before submitting our Section 37 application to the Scottish Government’s Energy Consents Unit.

    The first round of public consultation will take place from Monday 2 November to Tuesday 1 December 2026 and will seek people’s views on our initial proposals for the development.

    Following the first round of consultation, we will publish a report summarising the feedback received, our responses and how the feedback has influenced our proposals.

    Taking into account the feedback received during the first round of consultation, we will develop a detailed design, including the locations of access routes and working areas. We will also carry out a detailed Environmental Impact Assessment (EIA) and hold a second round of public consultation, giving people an opportunity to comment on the detailed design.

    After considering the feedback received during the second round of consultation, we will finalise our project proposals and hold a feedback event to present the final proposals intended to form part of the Section 37 application.

    Following the feedback event, we will submit an application to the Scottish Ministers for consent under Section 37 of the Electricity Act 1989 in relation to the relevant components of the Proposed Development. The submission will be accompanied with a Pre-Application Consultation Report documenting the consultation responses received, and the decisions made considering these responses, to refine the Proposed Development and complete the EIA.

    The Scottish Ministers will then undertake statutory consultation before deciding whether to grant consent for the application.

    Are you consulting landowners? 

    Yes, we will be talking to owners and occupiers of land that might be affected by our proposals. If you believe that your land may be affected and you have not yet heard from us, please contact us by clicking the 'Have Your Say' tab.

    Can you tell me more about Electric and Magnetic Fields (EMFs)?

    Wherever electricity is used there will also be electric and magnetic fields. This is inherent in the laws of physics – we can modify the fields to some extent, but if we are going to use electricity, then EMFs are inevitable.

    Like many other things that we encounter in nature, EMFs can be harmful at high-enough levels. But the fields required, for example, to start interfering with the body’s nervous system are much greater than those produced by the UK electricity system. Hundreds of millions of pounds have been spent investigating this issue around the world. Research still continues to seek greater clarity; however, the balance of scientific evidence to date suggests that EMFs do not cause disease.

    For more information, please see EMF - The Facts.

    Has the underground cable route already been decided?

    No, the underground cable route has not been finalised. There are six indicative route options that have been identified, and Option 5 is our indicative preferred route. We are asking for feedback on our preferred route as this will be subject to further development, engagement and assessment.

    Are SP Energy Networks contributing any community benefits for this project?

    SP Energy Networks follows the Scottish Government’s guidance on community benefits associated with electricity transmission infrastructure. Community benefits are managed separately by our dedicated Community Benefits team to ensure appropriate regulatory compliance. If you have any questions about community benefits, please contact the Community Benefits team directly by emailing communitybenefits@spenergynetworks.co.uk

    Will only one side (or circuit) of the transmission line operate at 400 kV? Why not both?

    Yes, our proposed upgrade will enable the No.2 (eastern) circuit to operate at 400 kV, while the No.1 (western) circuit will remain at 275 kV. The transmission network requires a 275 kV operation to maintained to support the supply of power to East Kilbride. This operational arrangement may be adjusted in the future to accommodate energy needs, however at present there is no requirement for both circuits to operate at 400 kV.

    When will the project be constructed?

    We are currently early in the development of the project and anticipate that we will submit an application for Section 37 consent in early 2029. It is expected that if consent is granted, construction works will start in 2030 and complete in 2032 (Please note these dates are indicative and subject to change). We will share more information on construction programme as the project progresses further.

    How are you accessing land for construction?

    Existing access arrangements for the operational overhead line will be utilised where practicable as part of our upgrade works. Some access roads may need to be constructed to facilitate access to work locations. We will be in touch with any landowners who may be impacted by access arrangements.

    For the underground cable, once a preferred route is selected following further site investigations and engagement, we would seek to engage with affected landowners and enter into voluntary agreements.

    Will there be any disruption or impacts during construction?

    During construction, there will be an increase in activity in the construction corridor around the overhead lines, underground cable route, and our substations and compounds. Noise mitigation strategies will be put in place to reduce the effects of construction noise in the local area. In addition, there may be an increased amount of traffic on local roads due to construction vehicles serving the project, though we will develop specified routes and measures to help manage and control this. More information on construction impacts will be available in our Environmental Impact Assessment Report, which we will submit as part of our application to the Scottish Ministers.

    How are environmental impacts being minimised?

    We aim to undertake these works with as minimal impact to the environment as possible. For this project, we are using existing infrastructure where available, reducing the need for new construction and supporting a more efficient use of resources.

    An Environmental Impact Assessment will be carried out to identify potential environmental effects, which will be avoided wherever practicable or reduced through appropriate mitigation measures. The findings will be presented in an Environmental Impact Assessment Report, which will be submitted as part of our application to the Scottish Ministers.

    Who can I reach out to for more information about the project?

    If you have any questions, please contact our project team by:
    Emailing: CVUP@spencontact.co.uk
    Writing to: FREEPOST SPEN CVUP
    Phoning: 0800 107 8231

    Contact Us

    Contact us

    You can contact us in the following ways:

    By phone:

    Call our freephone number 0800 107 8231.

    You can contact the project team by telephone at any time using our answerphone service. Please leave your name, contact number and details of your query, along with the name of the project. A member of our project team will aim to call you back within three working days (except Bank Holidays)

    By post:

    You can write to us free of charge at FREEPOST SPEN CVUP. Write this as a single line on the envelope. No stamp or any other details are needed, but make sure you include your name and address if you need us to send you anything

    By email:

    CVUP@spencontact.co.uk

    Sign up to receive emails

    If you would like to be added to our mailing list to receive project news and updates, please do so below.