Dunlaw Extension to Galashiels 132kv reinforcements

Scotland is producing more clean, green energy than ever before. We need to strengthen the transmission network so we can get it to the homes, businesses, hospitals and public services that need it.

There is an increase in generation capacity on the network that requires connection to the electricity grid between Dun Law and Galashiels. The network needs reinforcements to enable connection of this additional generation capacity to the grid and ensure we can comply with our statutory and license obligations.

Based on feedback received during the first round of consultation in summer 2024, changes have been made to the preferred route and proposed infrastructure. The proposed replacement line now includes overhead and underground power lines.

SP Energy Networks is consulting on modified proposals before identifying a final, Proposed Route to take forward to design development and further consultation before seeking consent to install the replacement line.

Project Documents

The updated consultation materials are available below.

If you would like a hard copy version of any consultation materials, please contact us. Any materials can also be made available in large print format.

Project Documents

An archive of the previous consultation materials is available below.

Virtual Consultation Room

Virtual Consultation Room

The feedback form and virtual consultation room will go live in-line with the re-engagement period opening on Wednesday, 5th March (see the ‘Have Your Say’ tab).

View the feedback form and virtual consultation room.

Have Your Say

Have Your Say

To present and consult on the preferred route modifications, we plan to host additional re-engagement events. The re-consultation period will open on Wednesday, 5th March and close on Wednesday, 2nd April.

You can view physical consultation materials and share feedback at the following events:

  • Wednesday, 12th March: Lauderdale Hotel: from 3:30 PM to 7:30 PM
  • Tuesday, 18th March: Carfraemill Hotel: from 3:30 PM to 7:30 PM

You can also share your views by email at dunlawext@spenergynetworks.co.uk or write to Dun Law OHL consultation, c/o AECOM, 1 Tanfield, Edinburgh, EH3 5DA.