Select Language:

Live Working Manual

The ScottishPower Safety Rules and support documentation is provided to ensure that work can be undertaken safely on or near ScottishPower’s electrical and mechanical equipment.

They are published for a target audience of third party companies with staff authorised to ScottishPower Safety Rules, Distribution Network Operators and Generator Operators.

Click a column header to sort the items in alphanumerical order by a particular column. All documents are in PDF format.

Document Issue Document Title Date
DOC-00-236 6 Live Working Manual - Document Index 2013-09-03
OPSAF-01-003 3 Live Working Manual - Foreword 2013-09-03
OPSAF-01-001 4 Policy for Live Work on System 2013-09-03
OPSAF-12-002 4 Issue of Live Working Manual 2013-09-03
OPSAF-13-002 4 Training and Authorisation for Work on Live Apparatus 2013-09-03
OPSAF-12-003 B Operation of LV System 2013-09-03
OPSAF-12-004 5 Operation of HV System up to and including 33kV 2013-09-03
OPSAF-12-005 2 Use of Approved Voltage Indicators (HV) and Capacitive Phasing-out Devices 2013-09-03
OPSAF-12-006 3 Connection of Mobile Generation in Parallel with the Distribution System 2013-09-03
OPSAF-12-060 1 Procedure for Fitting Fault Passage Indicators on 33kV Conductors - Hot Stick Method 2013-09-03
OPSAF-12-061 1 Low Voltage Mains / Service Continuity and Polarity Testing 2013-09-03
OPSAF-12-007 6 Substation Distribution Boards and Network Pillars 2013-09-03
OPSAF-12-008 B Substation Batteries 2013-09-03
OPSAF-12-009 3 Control and Protection Systems 2013-09-03
OPSAF-12-010 A Current Transformers (CTs) 2013-09-03
OPSAF-12-011 6 LWM Low Voltage Cable Jointing 2013-09-03
OPSAF-12-013 5 LV Overhead Lines 2013-09-03
OPSAF-12-014 4 Work on Overhead Lines - Hot Stick Method 2013-09-03
OPSAF-12-062 1 Installation of a High Level Operating Handle (Short Stick Method) 2013-09-03
OPSAF-12-015 3 HV Rubber Glove Working 2013-09-03
OPSAF-12-016 2 HV Long Stick Working 2013-09-03
OPSAF-12-017 4 Erection of Poles into Live HV (11kV and below) and LV Overhead Lines 2013-09-03
OPSAF-12-018 4 Working on Trees Adjacent to Live Overhead Lines 2013-09-03
OPSAF-12-019 2 Mirror Inspection Procedure Short Stick Method for Live HV Overhead Lines 2013-09-03
OPSAF-12-020 2 Testing PTE Earthing 2013-09-03
OPSAF-12-021 4 Work on Service Terminations 2013-09-03
OPSAF-12-022 3 Single Phase Meter Change 2013-09-03
OPSAF-12-023 4 Current Transformers (CT) Operated Meter Changes 2013-09-03
OPSAF-12-024 7 Approval of Equipment for Live Working or Testing 2013-09-03
OPSAF-12-025 5 Rubber Gloves for Electrical Purposes 2013-09-03
OPSAF-12-026 3 Portable Electrical Apparatus 2013-09-03
OPSAF-12-027 1 Approved Equipment for HV Rubber Glove Working 2013-09-03
OPSAF-12-028 2 Inspecting and Testing of Insulated Rods 2013-09-03