Live Working Manual The ScottishPower Safety Rules and support documentation is provided to ensure that work or testing can be undertaken safely on or near ScottishPower’s electrical and mechanical equipment. They are published for a target audience of third party companies with staff authorised to ScottishPower Safety Rules, Distribution Network Operators and Generator Operators. We continually update this page by adding, replacing or removing documents. Please check back regularly to ensure you are using the most current version. Document Issue Document Title Date DOC-00-236 12 Virtual Live Working Manual Index 2020-07-07 OPSAF-01-003 3 Live Working Manual - Foreword 2013-09-03 OPSAF-01-001 LWM 1.1 4 Policy for Live Work on System 2013-09-03 OPSAF-12-002 LWM 1.3 5 Access to Energy Networks Live Working Manual 2018-10-26 OPSAF-13-002 LWM 1.4 5 Training and Authorisation for Operations, Work or Testing on or Near Live Apparatus 2018-10-26 OPSAF-12-003 LWM 2.1 B Operation of LV System 2013-09-03 OPSAF-12-004 LWM 2.2 7 Operation of the HV AC System up to and including 33kV 2019-05-28 OPSAF-12-005 LWM 2.3 3 Use of Approved HV Voltage Indicators and Phasing-Out Devices 2018-10-26 OPSAF-12-006 LWM 2.4 3 Connection of Mobile Generation in Parallel with the Distribution System 2013-09-03 OPSAF-12-060 LWM 2.5 1 Procedure for Fitting Fault Passage Indicators on 33kV Conductors - Hot Stick Method 2013-09-03 OPSAF-12-061 LWM 2.6 1 Low Voltage Mains / Service Continuity and Polarity Testing 2013-09-03 OPSAF-12-007 LWM 3.1 7 Substation Distribution Boards and Network Pillars 2018-10-26 OPSAF-12-008 LWM 3.2 3 Substation Batteries and Chargers 2018-10-26 OPSAF-12-009 LWM 3.3 4 Control and Protection Systems 2018-10-26 OPSAF-12-010 LWM 3.4 2 Current Transformers (CTs) 2018-10-26 OPSAF-12-011 LWM 4.1 7 Low Voltage Cable Jointing 2019-12-30 OPSAF-12-013 LWM 5.1 5 LV Overhead Lines 2013-09-03 OPSAF-12-014 LWM 5.2 4 Work on Overhead Lines - Hot Stick Method 2013-09-03 OPSAF-12-062 LWM 5.2.1 1 Installation of a High Level Operating Handle (Short Stick Method) 2013-09-03 OPSAF-12-015 LWM 5.3 3 HV Rubber Glove Working 2013-09-03 OPSAF-12-016 LWM 5.4 3 HV Long Stick Working 2018-10-26 OPSAF-12-017 LWM 5.5 5 Erection of Poles into Live HV (11kV and below) and LV Overhead Lines 2018-10-26 OPSAF-12-018 LWM 5.6 4 Working on Trees Adjacent to Live Overhead Lines 2013-09-03 OPSAF-12-019 LWM 5.7 2 Mirror Inspection Procedure Short Stick Method for Live HV Overhead Lines 2013-09-03 OPSAF-12-020 LWM 5.8 2 Testing PTE Earthing 2013-09-03 OPSAF-12-021 LWM 6.1 4 Work on Service Terminations 2013-09-03 OPSAF-12-022 LWM 7.1 4 Single Phase Meter Change 2019-12-30 OPSAF-12-023 LWM 7.2 5 Current Transformers (CT) Operated Meter Changes 2019-12-30 OPSAF-12-024 LWM 8.1 7 Approval of Equipment for Live Working or Testing 2013-09-03 OPSAF-12-025 LWM 8.2 6 Insulated Gloves for Electrical Purposes other than HV Rubber Glove Working 2019-03-20 OPSAF-12-027 LWM 8.4 1 Approved Equipment for HV Rubber Glove Working 2013-09-03 OPSAF-12-028 LWM 8.5 2 Inspecting and Testing of Insulated Rods 2013-09-03