Live Working Manual

The ScottishPower Safety Rules and support documentation is provided to ensure that work or testing can be undertaken safely on or near ScottishPower’s electrical and mechanical equipment.

They are published for a target audience of third party companies with staff authorised to ScottishPower Safety Rules, Distribution Network Operators and Generator Operators.

We continually update this page by adding, replacing or removing documents. Please check back regularly to ensure you are using the most current version.

IMPORTANT: When you open the document, please press Ctrl F5 to refresh in case your device holds a cached version.

DocumentIssueDocument TitleDate
DOC-00-23615Virtual Live Working Manual Index2021-06-02
OPSAF-01-0033Live Working Manual - Foreword2013-09-03
OPSAF-01-001
LWM 1.1
4Policy for Live Work on System2013-09-03
OPSAF-12-002
LWM 1.3
5Access to Energy Networks Live Working Manual2018-10-26
OPSAF-13-002
LWM 1.4
5Training and Authorisation for Operations, Work or Testing on or Near Live Apparatus2018-10-26
OPSAF-12-003
LWM 2.1
BOperation of LV System2013-09-03
OPSAF-12-004
LWM 2.2
7Operation of the HV AC System up to and including 33kV2019-05-28
OPSAF-12-005
LWM 2.3
3Use of Approved HV Voltage Indicators and Phasing-Out Devices2018-10-26
OPSAF-12-006
LWM 2.4
3Connection of Mobile Generation in Parallel with the Distribution System2013-09-03
OPSAF-12-061
LWM 2.6
1Low Voltage Mains / Service Continuity and Polarity Testing2013-09-03
OPSAF-12-007
LWM 3.1
7Substation Distribution Boards and Network Pillars 2018-10-26
OPSAF-12-008
LWM 3.2
3Substation Batteries and Chargers2018-10-26
OPSAF-12-009
LWM 3.3
4Control and Protection Systems2018-10-26
OPSAF-12-010
LWM 3.4
2Current Transformers (CTs)2018-10-26
OPSAF-12-011
LWM 4.1
7Low Voltage Cable Jointing2019-12-30
OPSAF-12-013
LWM 5.1
5LV Overhead Lines2013-09-03
OPSAF-12-015
LWM 5.3
4HV Rubber Glove Working2021-04-19
OPSAF-12-016
LWM 5.4
3HV Long Stick Working2018-10-26
OPSAF-12-017
LWM 5.5
5Erection of Poles into Live HV (11kV and below) and LV Overhead Lines2018-10-26
OPSAF-12-018
LWM 5.6
4Working on Trees Adjacent to Live Overhead Lines2013-09-03
OPSAF-12-021
LWM 6.1
4Work on Service Terminations2013-09-03
OPSAF-12-022
LWM 7.1
4Single Phase Meter Change2019-12-30
OPSAF-12-023
LWM 7.2
5Current Transformers (CT) Operated Meter Changes2019-12-30
OPSAF-12-024
LWM 8.1
7Approval of Equipment for Live Working or Testing2013-09-03
OPSAF-12-025
LWM 8.2
6Insulated Gloves for Electrical Purposes other than HV Rubber Glove Working2019-03-20
OPSAF-12-027
LWM 8.4
1Approved Equipment for HV Rubber Glove Working2013-09-03
OPSAF-12-028
LWM 8.5
2Inspecting and Testing of Insulated Rods2013-09-03

 

 

Footer

Hi! I'm the SP Energy Networks System Agent, can I help you?

Avatar