Management Safety Procedures

The ScottishPower Safety Rules and support documentation is provided to ensure that work or testing can be undertaken safely on or near ScottishPower’s electrical and mechanical equipment.

They are published for a target audience of third party companies with staff authorised to ScottishPower Safety Rules, Distribution Network Operators and Generator Operators.

We continually update this page by adding, replacing or removing documents. Please check back regularly to ensure you are using the most current version.

IMPORTANT: When you open the document, please press Ctrl F5 to refresh in case your device holds a cached version.

DocumentIssueDocument TitleDate
DOC-00-23857Management Safety Procedures (MSPs) Index2021-04-19
OPSAF-11-0015Explanatory Notes2018-04-04
OPSAF-11-0025Definitions2018-07-20
OPSAF-11-003
MSP 1.1
2Accompanied Work2013-09-03
OPSAF-11-004
MSP 1.2
11Operational Compliance Auditing2017-02-17
OPSAF-11-005
MSP 1.3
1Achieving Safety from the System by Limiting the Testing, Work or Work Area2013-09-03
OPSAF-11-006
MSP 1.4
4Achieving Safety on Wood Poles Supporting Live HV Conductors by Limiting the Testing, Work or Work Area2013-09-03
OPSAF-11-007
MSP 1.5
5Achieving Safety on Overhead Lines While Carrying Out HV Rubber Glove Working2021-05-11
OPSAF-11-008
MSP 1.6
5Portable Earthing and Shorting Leads for Use in Substations, Power Stations and on Overhead Lines2013-09-03
OPSAF-11-009
MSP 1.7
4Application, Removal, Storage and Inspection of Portable Earths, Field Equipment Earths and LV Portable Shorts2015-11-16
OPSAF-11-010
MSP 1.8
5Recording and Reporting of High Voltage and Low Voltage Switching2016-08-29
OPSAF-11-049
MSP-1.10
1Management of Drain Earths for Work on Steel Tower Overhead Lines2013-09-03
OPSAF-11-012
MSP 2.1
1Arrangement for the Establishment and Maintenance of General Safety2013-09-03
OPSAF-11-013
MSP 2.2
6Safety Rules and Support Documents Approval and Issue2020-04-14
OPSAF-11-014
MSP 2.3
3The Publication and Availability of ScottishPower Safety Rules and Support Documents2019-05-28
OPSAF-11-015
MSP 2.4
3Procedure for Work On or Testing Of Plant and Apparatus where The Safety Rules or their Support Documents Cannot or Should Not be Applied2018-09-12
OPSAF-11-051
MSP 2.4.2
4Victor Test Instrument Approved Procedure2019-11-26
OPSAF-11-047
MSP 2.4.3
2Approved Procedure for 33kV or 11kV Work or Testing between Braehead Park 132kV Substation and Renfrew Ferry No 1, Tee Renfrew Ferry 2/3 Primary Switchboards2020-09-29
OPSAF-11-052
MSP 2.4.5
1Procedure To Establish Earths On Transmission Circuits in Scotland, Which Have No Electrical Connections and Do Not Comply With The Safety Rules2013-09-03
OPSAF-11-054
MSP 2.4.7
2Interim Procedure for Safety Locking Ring Switches on 33kV RMUs with A.E.I or Ferguson-Palin IVS type Oil Switches2013-09-03
OPSAF-11-057
MSP 2.4.8
5Method Statement for Live Tank Oil Sampling (LTOS) of RMUs and OSWs2019-06-24
OPSAF-11-065
MSP 2.4.15
2Work or Testing on Ring Main Units Without a Busbar Earth Facility With the Circuit Breaker Cable Box Live2019-03-01
OPSAF-11-098
MSP 2.4.37
1Approved Procedure -  Installation of ADSS (All-Dielectric Self-Supporting) cable between 132kV towers DE100 and N240 at Kendoon, Dumfries and Galloway.2018-09-12
OPSAF-11-101
MSP 2.4.40
1Approved Procedure - Removal of Voltage Test Sockets from SOP 215 LV Take-Off Chambers2019-08-20
OPSAF-11-106 MSP 2.4.431Approved Procedure - Work and Testing on the Western Link Offshore Marine High Voltage DC Cables2020-10-30
OPSAF-11-016
MSP 2.5
3Procedures to be Adopted When the Safety Rules (Safety Document Process and/or Safety Features) Cannot be Applied2013-09-03
OPSAF-11-017
MSP 2.6
1Work in Hall Type Indoor Substations (Hunterston 132kV)2013-09-03
OPSAF-11-018
MSP 2.7
2Objection to Instructions Issued Under the Safety Rules2019-03-20
OPSAF-11-020
MSP 2.9
2Management Considerations for Work on Overhead Line Earthwires and Optical Cables Adjacent to a Live Circuit 2019-03-20
OPSAF-11-022
MSP 2.11
2Procedure for Wood Pole Overhead Lines (up to 33kV) Maintenance by more than One Working Party within One Isolated Zone2013-09-03
OPSAF-11-064
MSP 2.12
2Procedure To Be Adopted When Working on High Voltage Mechanically Switched Capacitors with Damping Network (MSCDN)2018-01-31
OPSAF-11-078
MSP 2.13 
1Working on High Voltage Series Compensation Equipment2015-05-29
OPSAF-11-023
MSP 3.1
2Application of Scottishpower Safety Rules 2013-09-03
OPSAF-11-024
MSP 3.2
7Connection, Energising, Commissioning and Permanent Disconnection of High Voltage Apparatus2013-09-03
OPSAF-11-025
MSP 3.3
3Restoration of Motive Power2020-09-11
OPSAF-11-043
MSP 3.4
2Jumpers at a Point of Isolation2020-02-11
OPSAF-11-027
MSP 4.2
2Application and Use of Locks for Access and Operational Equipment 2013-09-03
OPSAF-11-028
MSP 4.3
4Procedures for Safe Custody of Safety Keys, Key Safe Keys and Key Safes2019-03-20
OPSAF-11-029
MSP 4.4
4Role of Selected Person and Senior Authorised Person2018-07-20
OPSAF-11-030
MSP 4.5
4System Control Boundaries and Control Boundary Procedures 2013-09-03
OPSAF-11-031
MSP  4.6
6Procedure / Guidance for Safety Documents 2018-09-27
OPSAF-13-001
MSP 5.1
11Authorisation Procedures2019-12-30
OPSAF-13-003
MSP 5.1.1
8Route to Authorisation2019-11-25
OPSAF-11-032
MSP 5.2
4Responsibilities of Control Persons and Authorised Persons2013-09-03
OPSAF-11-034
MSP 5.4
4Field Control - Transfer of Control Persons Responsibility for Work on the High Voltage System2013-09-03
OPSAF-11-035
MSP 5.5
3Procedures for Standby2013-09-03
OPSAF-13-004
MSP 5.6
3Operational Incident Procedure Authorisation Withdrawal2019-03-20
OPSAF-11-044
MSP 6.1
2Guidance on Interpretation of Definitions Part D - Safety Rules2013-09-03
 